campus build · BP · business park tier
Business-park campus
Twenty-four modules on two floors, or the same spaces fitted into a rented floor of about 340 m2. Two studios below, project and quiet spaces above.
at a glance
Size and capacity
- Tier: Business park
- Modules: 24
- Floors: 2
- Floor area: about 336 m2
- Learners at one time: 84
- Rooms: 15
Used for. A campus close to employers: core learning, project rooms and a coffee bar. Specialist labs are booked at the flagship.
space schedule
Spaces, modules and seats
| Space | Group | Count | Modules | Seats |
|---|---|---|---|---|
| Open learning studio | Learn | 2 | 8 | 60 |
| Reception and lounge | Welcome | 1 | 2 | 8 |
| Coffee bar and pantry | Care | 1 | 1 | 6 |
| Washrooms, ground floor, with an accessible cubicle | Support | 1 | 1 | - |
| Project rooms (two rooms in three modules) | Collaborate | 1 | 3 | 12 |
| Meeting room | Collaborate | 1 | 2 | 10 |
| Silent study area | Focus | 1 | 2 | 12 |
| Open workstation area | Work | 1 | 2 | 18 |
| Staff office | Work | 1 | 1 | 2 |
| Store and server room | Support | 1 | 1 | - |
| Washrooms, upper floor | Support | 1 | 1 | - |
| Total | 24 | 128 |
- Ground floor holds the busy, public rooms. The upper floor holds the quiet rooms.
- Two stairs at opposite ends give two ways out from the upper floor. A platform lift gives step-free access.
- When the campus is fitted into a rented floor, the module grid is kept as a planning grid, so the same element codes and counts still apply.
element list
Coded elements and quantities
Every line uses a code from the element library. No maker is named. Quantities are worked out from the space schedule by the rules of the standard.
| Code | Element | Quantity | Unit |
|---|---|---|---|
| CS-SH-01 | Module shell, 2.4 x 5.8 x 2.9 m | 24 | each |
| CS-SH-02 | Terrace module with guard rail | 2 | each |
| CS-SH-03 | Straight stair, single flight | 1 | each |
| CS-SH-04 | Wide stair, dog-legged or L-shaped | 1 | each |
| CS-SH-05 | Glass curtain wall panel | 11.0 | m2 |
| CS-SH-06 | Sliding glass door | 2 | each |
| CS-SH-08 | Access ramp, step-free entrance | 1 | each |
| CS-SH-09 | Platform lift, one storey | 1 | each |
| CS-IN-03 | Folding partition | 30 | m2 |
| CS-IN-05 | Floor finish, dry areas | 294 | m2 |
| CS-IN-06 | Floor and wall finish, wet areas | 42 | m2 |
| CS-IN-07 | Fire-exit door with push bar | 4 | each |
| CS-FU-01 | Linear workstation | 18 | each |
| CS-FU-02 | Meeting table set, 10 seats | 1 | each |
| CS-FU-03 | Phone booth | 4 | each |
| CS-FU-04 | Meeting pod, 4 seats | 1 | each |
| CS-FU-05 | Library shelf bay | 2 | each |
| CS-FU-06 | Learner seat | 84 | each |
| CS-SV-01 | Sub-board, per floor | 2 | each |
| CS-SV-02 | Cooling unit, per room | 15 | each |
| CS-SV-03 | Smoke detector and sounder group | 17 | each |
| CS-SV-04 | Comms cabinet | 1 | each |
| CS-SV-05 | Solar array, roof | 14 | kW |
| CS-SV-06 | Emergency light and exit sign group | 19 | each |
Reference design v0.1. Planning values for teaching and early design. A licensed local engineer and the local authority confirm every real project.
build order
How it is put together
- Agree the base, the crane position and the lift order with the engineer.
- Place the twelve ground modules, then the stairs, then the twelve upper modules and the two terraces.
- Seal the roof, fit the glass walls, doors, rails and the platform lift.
- Run services floor by floor: power, cooling, water, drainage, data, fire. Test each before finishes close it in.
- Finishes, furniture and signs. Walk every exit route, then hand over with the as-built model.
model files
File names for this build
C01-B1-L1-ARC: architecture model, floor 1C01-B1-L1-STR: structure model, floor 1C01-B1-L1-MEP: services model, floor 1C01-B1-L2-ARC: architecture model, floor 2- Replace C01 with the number of the real campus. The element code follows when a file holds one element type, for example
C01-B1-L1-ARC-CS-SH-05for the glass wall.
learn with this build
Your project on this campus type
L5 Specialist. Prepare the fabrication model for one stair bay and one terrace of the business-park campus. Link the 24 modules to a build programme and a cost list by element code. Open L5 Specialist
L6 Advanced. Write the BIM execution plan for a new business-park campus in a climate of your choice, then audit a model with planted faults against it. Open L6 Advanced
practice files
Download and open the model
A practice model of this campus type in an open format (IFC), at LOD 200. It holds 24 module shells on 2 floors. Each shell carries its element code, its level of development and the space it belongs to. Doors, walls and furniture are left for you to add.
- Practice model, Business-park campus (IFC file)
- Element list, Business-park campus (CSV file, opens in any spreadsheet)
- Open the model in any free viewer that reads open IFC files. Click one module and read its properties: you will see the code CS-SH-01 and LOD 200.
For learning only. Not a drawing for building.