Run a pilot of electric car charging station provider in Canada: eight modules from user need to review, with rules, costs, risks and a seven-level ladder.

about this course

What you will be able to do

L4 Practitioner8 modules · 58 hMobility / Energy / InfrastructurePhase 1 (2026–2027)
  • Understand Chargers earn where cars stop for a while and power is available..
  • Apply Charging involves electricity and public safety..
  • Apply Capacity and layout come first..
  • Evaluate Revenue per kWh, minus power cost and fees..
  • Apply Uptime is the product..
  • Create Partners host; drivers return..
  • Evaluate Plan for hazards and demand peaks..
  • Create Prove one site..

Task, condition and standard

Task

Run a 30 to 90 day pilot of a small electric car charging station provider offer for real users in Canada and keep a full record.

Condition

About 58 hours over 3 to 6 months. A free spreadsheet, a phone or computer, one mentor, a peer circle and at least five real users. Practice partners are agreed locally.

Standard

Rules table complete with dated sources; cost sheet checked by a mentor; risk register and privacy note written; pilot reviewed with evidence; at least 70% on the ten-question check.

Field: energy, environment and resource work. Who it is for: students, career changers, returners, newcomers to Canada, small-business starters. Requirements: none. Materials: lesson text, templates, rules table, cost sheet, risk register, rubric, ten-question check with answers.

lesson by lesson

8 modules with worked examples

Module 1 Find the right sites for chargers 6 hUnderstand

Chargers earn where cars stop for a while and power is available.

  • Types: home, workplace, destination (1-4 hours), fast (20-40 minutes).
  • Site scores: dwell time, traffic, nearby amenities, grid power, safety, cost to connect.
  • Visit three sites; count cars parked per hour.
  • Write a one-page site pitch to an owner.
  • Ask the local utility early for the power available at the site and the cost to connect.
  • Count cars at three times of day to see the peak and the quiet periods.
  • Ask the owner what they gain: footfall, rent or a share of revenue.
Worked example. Shopping centre: average stay 90 minutes, 60 EV cars a day, grid connection 150 kW available; score 4.2/5. If 25% of the cars would charge, 60 x 0.25 = 15 sessions a day is the ceiling to test. At 50 kW a 28 kWh session takes 28 / 50 = 0.56 hour, about 34 minutes, which fits inside the 90-minute stay.

Activity. Score three sites and choose one.

Standard to meet. Record counts.

Module 2 Know electrical and utility rules 6 hApply

Charging involves electricity and public safety.

  • Electrical work follows the provincial code and licensed electricians; permits and inspections are required.
  • Utility connection agreements set capacity and timing.
  • Accessibility and signage rules may apply; check the provincial and municipal rule.
  • Selling electricity by the kWh may need approved meters under federal measurement rules, plus provincial energy rules; check which billing method is allowed.
  • Ask the provincial electrical authority which permit and inspection steps apply and who must hold the licence.
  • Ask the utility for the connection timeline and write it into your plan.
  • Check the provincial rule on whether you may charge by kWh, by time or by session.
Worked example. Row: 'Install a fast charger | provincial electrical authority | permit and inspection | before energising | inspection certificate'. Row: 'Charge by the kWh | Measurement Canada and the provincial energy regulator | check allowed method | before opening | written answer filed'. If the utility needs 12 weeks and the permit 4 weeks and they run in parallel, plan 12 weeks, not 16.

Activity. Build a rules table for one site.

Standard to meet. Cite a source and a date for every row.

Module 3 Plan the installation 10 hApply

Capacity and layout come first.

  • Compute power: number of chargers x kW, with load management to share capacity.
  • Plan cables, trenching, lighting and drainage.
  • Choose connectors and payment methods that suit local cars.
  • Plan remote monitoring.
  • Have a licensed electrician size the cable and breaker; do not guess.
  • Lay out the bays so every cable reaches and none crosses a walkway.
  • Choose the load-management setting (fair share or first come) and write it down.
Worked example. 4 chargers of 50 kW on a 150 kW supply with load sharing: no more than 3 run at full power at once (3 x 50 = 150). If all 4 are in use, each gets 150 / 4 = 37.5 kW, so a 28 kWh session takes 28 / 37.5 = about 0.75 hour, or about 45 minutes.

Activity. Draw a site layout and load plan.

Standard to meet. Check power sums.

Module 4 Price charging and prove the business 8 hEvaluate

Revenue per kWh, minus power cost and fees.

  • Energy margin = selling price - energy price - network fees.
  • Add idle fees to free the bay.
  • Include maintenance, software and site lease.
  • Compute payback.
  • List the cost lines (hardware, install, connection, signs, software) and sum them.
  • Set the price per kWh from the margin you need, then compare with nearby prices.
  • Run three cases: low, medium and high sessions per day.
Worked example. Installed cost 18,000 per charger (teaching figure, not a market price). High case: 12 sessions a day x 28 kWh x 0.18 margin = 60.48 a day, about 1,800 a month; less 400 for site, software and upkeep leaves 1,400, so payback = 18,000 / 1,400 = about 13 months. Low case: 5 sessions a day gives 25.20 a day, about 756 a month; less 400 leaves 356, so payback = 18,000 / 356 = about 51 months. Teaching figures in CAD.

Activity. Build a payback model with a low-use case.

Standard to meet. Show three cases.

Module 5 Operate reliably 8 hApply

Uptime is the product.

  • Monitor remotely; alert on faults.
  • Respond within a set time.
  • Clean and inspect monthly.
  • Track uptime and sessions.
  • Write a fault response plan: who is called, in what order and within what time.
  • Keep spare parts for common faults (connector, cable) on a shelf.
  • Check payment terminals and screens weekly and record the result.
Worked example. Uptime 97% target; fault repaired within 12 hours. In a 30-day month (720 hours), 3% downtime allows only 720 x 0.03 = 21.6 hours, so one 24-hour fault alone breaks the target; spare parts on the shelf prevent this.

Activity. Keep a 4-week uptime log.

Standard to meet. Record faults and fixes.

Module 6 Win site hosts and drivers 6 hCreate

Partners host; drivers return.

  • Offer revenue share to site owners.
  • List on charging maps.
  • Offer fleet plans.
  • Collect feedback.
  • Prepare a one-page revenue-share offer showing the owner's income at low, medium and high use.
  • List the site on charging maps and check that its details are right.
  • Ask five drivers what would make them return and record the answers.
Worked example. Funnel: 20 sites, 6 meetings, 2 agreements; that is 6 / 20 = 30% to a meeting and 2 / 6 = 33% to an agreement. If the owner gets 10% of a 1,800 monthly margin, the owner earns 180 and you keep 1,620.

Activity. Pitch three site owners.

Standard to meet. Pitch has numbers.

Module 7 Manage safety and grid risk 6 hEvaluate

Plan for hazards and demand peaks.

  • Cable and trip hazards, vandalism, weather.
  • Peak demand charges.
  • Cyber security for chargers.
  • Insurance.
  • Walk the site at night and list hazards (lighting, trip points, vehicle impact) with a fix for each.
  • Ask the utility how demand charges are set and compute the worst month.
  • Change default passwords, apply updates and limit who can control the chargers.
Worked example. Risk: 'Peak demand charge | 3 x 4 | load management | ops | monthly'. Suppose the utility charged 12 per kW of monthly peak (an assumed rate; check the real tariff): a 150 kW peak costs 150 x 12 = 1,800, while limiting load to 100 kW costs 100 x 12 = 1,200, a saving of 600 a month.

Activity. Write risk register.

Standard to meet. Name an owner for each item.

Module 8 Pilot and expand 8 hCreate

Prove one site.

  • Run a 90-day pilot at one site.
  • Measure sessions, kWh, uptime.
  • Stop rule: under 3 sessions a day after 60 days means move or adjust price.
  • Plan roll-out.
  • Set up counters for sessions, kWh, uptime and revenue before day one.
  • Review at day 30, 60 and 90 and adjust price or signs using the data.
  • Write the roll-out plan with site criteria, budget and order.
Worked example. 5.2 sessions per day; proceed. Over 90 days that is 5.2 x 90 = 468 sessions, and at 28 kWh each, 468 x 28 = 13,104 kWh. The stop rule of 3 sessions a day would be 3 x 90 = 270 sessions, so the site clears it easily.

Activity. Run pilot review.

Standard to meet. Review has decision.

assessment

How you are checked

Evidence: value statement, rules table, core task record, cost sheet, 4-week log, funnel, risk register and privacy note, pilot review and 12-month plan. A mentor and two peers mark it with this rubric. Pass: no criterion at "Not yet".

Marking rubric
CriterionNot yetMeetsExceeds
Evidence qualityClaims without recordsDated records for claimsEvery claim linked to a dated source or measure
Numbers and unitsMissing units or currencyCorrect with unitsCorrect with a check and what-if cases
Rules and safetyRules guessedRules named with enforcersRules confirmed in writing with the official body
User focusNo real userFive users heardChanges made from user feedback
ReflectionNo lessonsThree lessonsLessons turned into a dated plan

Ten-question check, with model answers

Q1. Why share load across chargers?

Model answer: To stay within site capacity. (Covered in module 3: Plan the installation. To pass that module: Check power sums.)

Q2. What is dwell time?

Model answer: How long a car stays parked. (Covered in module 1: Find the right sites for chargers. To pass that module: Record counts.)

Q3. Who may do the electrical work?

Model answer: Licensed electricians with permits and inspection. (Covered in module 2: Know electrical and utility rules. To pass that module: Cite a source and a date for every row.)

Q4. What is energy margin?

Model answer: Selling price minus energy price and fees. (Covered in module 4: Price charging and prove the business. To pass that module: Show three cases.)

Q5. Why charge idle fees?

Model answer: To free the bay for others. (Covered in module 4: Price charging and prove the business. To pass that module: Show three cases.)

Q6. What uptime target does the plan set?

Model answer: About 97% or better, with faults repaired inside 12 hours. (Covered in module 5: Operate reliably. To pass that module: Record faults and fixes.)

Q7. Why monitor remotely?

Model answer: To catch faults early. (Covered in module 5: Operate reliably. To pass that module: Record faults and fixes.)

Q8. What is a demand charge?

Model answer: A fee based on peak power drawn. (Covered in module 7: Manage safety and grid risk. To pass that module: Name an owner for each item.)

Q9. What triggers a move?

Model answer: Under 3 sessions a day after 60 days. (Covered in module 8: Pilot and expand. To pass that module: Review has decision.)

Q10. Why insure?

Model answer: Liability and equipment damage. (Covered in module 7: Manage safety and grid risk. To pass that module: Name an owner for each item.)

levels

Seven levels, L1 to L7

Seven slides, one per level. Open each for the slide text and the speaker notes.

Slide 1 L1 Sustainability aware learner: Find the right sites for chargers

L1: Sustainability aware learner. You can define: name the main terms, people and rules of electric car charging station provider. Focus module: Find the right sites for chargers (Understand, 6 h). Chargers earn where cars stop for a while and power is available. Key points: Types: home, workplace, destination (1-4 hours), fast (20-40 minutes). Site scores: dwell time, traffic, nearby amenities, grid power, safety, cost to connect. Visit three sites; count cars parked per hour. Write a one-page site pitch to an owner. Ask the local utility early for the power available at the site and the cost to connect. Count cars at three times of day to see the peak and the quiet periods. Ask the owner what they gain: footfall, rent or a share of revenue.

Speaker notes. Teach: open with the worked example. Shopping centre: average stay 90 minutes, 60 EV cars a day, grid connection 150 kW available; score 4.2/5. If 25% of the cars would charge, 60 x 0.25 = 15 sessions a day is the ceiling to test. At 50 kW a 28 kWh session takes 28 / 50 = 0.56 hour, about 34 minutes, which fits inside the 90-minute stay. Then set the activity: Score three sites and choose one. Mark against the standard: Record counts. Check at this level: What is dwell time? Model answer: How long a car stays parked. Level note: Start here if new. Evidence: a one-page glossary and a visit or interview note.

Slide 2 L2 Field or plant assistant: Know electrical and utility rules

L2: Field or plant assistant. You can describe: explain how electric car charging station provider works from first contact to result. Focus module: Know electrical and utility rules (Apply, 6 h). Charging involves electricity and public safety. Key points: Electrical work follows the provincial code and licensed electricians; permits and inspections are required. Utility connection agreements set capacity and timing. Accessibility and signage rules may apply; check the provincial and municipal rule. Selling electricity by the kWh may need approved meters under federal measurement rules, plus provincial energy rules; check which billing method is allowed. Ask the provincial electrical authority which permit and inspection steps apply and who must hold the licence. Ask the utility for the connection timeline and write it into your plan. Check the provincial rule on whether you may charge by kWh, by time or by session.

Speaker notes. Teach: open with the worked example. Row: 'Install a fast charger | provincial electrical authority | permit and inspection | before energising | inspection certificate'. Row: 'Charge by the kWh | Measurement Canada and the provincial energy regulator | check allowed method | before opening | written answer filed'. If the utility needs 12 weeks and the permit 4 weeks and they run in parallel, plan 12 weeks, not 16. Then set the activity: Build a rules table for one site. Mark against the standard: Cite a source and a date for every row. Check at this level: Who may do the electrical work? Model answer: Licensed electricians with permits and inspection. Level note: Evidence: a flow chart and a two-minute spoken explanation.

Slide 3 L3 Technician: Plan the installation

L3: Technician. You can apply: carry out a routine task in electric car charging station provider to a written standard. Focus module: Plan the installation (Apply, 10 h). Capacity and layout come first. Key points: Compute power: number of chargers x kW, with load management to share capacity. Plan cables, trenching, lighting and drainage. Choose connectors and payment methods that suit local cars. Plan remote monitoring. Have a licensed electrician size the cable and breaker; do not guess. Lay out the bays so every cable reaches and none crosses a walkway. Choose the load-management setting (fair share or first come) and write it down.

Speaker notes. Teach: open with the worked example. 4 chargers of 50 kW on a 150 kW supply with load sharing: no more than 3 run at full power at once (3 x 50 = 150). If all 4 are in use, each gets 150 / 4 = 37.5 kW, so a 28 kWh session takes 28 / 37.5 = about 0.75 hour, or about 45 minutes. Then set the activity: Draw a site layout and load plan. Mark against the standard: Check power sums. Check at this level: Why share load across chargers? Model answer: To stay within site capacity. Level note: Evidence: a supervised task record that meets the standard once.

Slide 4 L4 Specialist: Price charging and prove the business

L4: Specialist. You can analyse: diagnose why an electric car charging station provider result missed its target and fix it. Focus module: Price charging and prove the business (Evaluate, 8 h). Revenue per kWh, minus power cost and fees. Key points: Energy margin = selling price - energy price - network fees. Add idle fees to free the bay. Include maintenance, software and site lease. Compute payback. List the cost lines (hardware, install, connection, signs, software) and sum them. Set the price per kWh from the margin you need, then compare with nearby prices. Run three cases: low, medium and high sessions per day.

Speaker notes. Teach: open with the worked example. Installed cost 18,000 per charger (teaching figure, not a market price). High case: 12 sessions a day x 28 kWh x 0.18 margin = 60.48 a day, about 1,800 a month; less 400 for site, software and upkeep leaves 1,400, so payback = 18,000 / 1,400 = about 13 months. Low case: 5 sessions a day gives 25.20 a day, about 756 a month; less 400 leaves 356, so payback = 18,000 / 356 = about 51 months. Teaching figures in CAD. Then set the activity: Build a payback model with a low-use case. Mark against the standard: Show three cases. Check at this level: What is energy margin? Model answer: Selling price minus energy price and fees. Level note: Evidence: a fault or gap analysis with a fix and a repeat test. This course targets this level.

Slide 5 L5 Senior specialist or lead: Win site hosts and drivers

L5: Senior specialist or lead. You can evaluate: judge options for electric car charging station provider against cost, risk and quality. Focus module: Win site hosts and drivers (Create, 6 h). Partners host; drivers return. Key points: Offer revenue share to site owners. List on charging maps. Offer fleet plans. Collect feedback. Prepare a one-page revenue-share offer showing the owner's income at low, medium and high use. List the site on charging maps and check that its details are right. Ask five drivers what would make them return and record the answers.

Speaker notes. Teach: open with the worked example. Funnel: 20 sites, 6 meetings, 2 agreements; that is 6 / 20 = 30% to a meeting and 2 / 6 = 33% to an agreement. If the owner gets 10% of a 1,800 monthly margin, the owner earns 180 and you keep 1,620. Then set the activity: Pitch three site owners. Mark against the standard: Pitch has numbers. Check at this level (this question is covered in module 4: Price charging and prove the business): Why charge idle fees? Model answer: To free the bay for others. Level note: Evidence: an options paper with numbers and a recommendation defended to a panel.

Slide 6 L6 Programme manager: Manage safety and grid risk

L6: Programme manager. You can create: design and pilot a new offer or process in electric car charging station provider. Focus module: Manage safety and grid risk (Evaluate, 6 h). Plan for hazards and demand peaks. Key points: Cable and trip hazards, vandalism, weather. Peak demand charges. Cyber security for chargers. Insurance. Walk the site at night and list hazards (lighting, trip points, vehicle impact) with a fix for each. Ask the utility how demand charges are set and compute the worst month. Change default passwords, apply updates and limit who can control the chargers.

Speaker notes. Teach: open with the worked example. Risk: 'Peak demand charge | 3 x 4 | load management | ops | monthly'. Suppose the utility charged 12 per kW of monthly peak (an assumed rate; check the real tariff): a 150 kW peak costs 150 x 12 = 1,800, while limiting load to 100 kW costs 100 x 12 = 1,200, a saving of 600 a month. Then set the activity: Write risk register. Mark against the standard: Name an owner for each item. Check at this level: Why insure? Model answer: Liability and equipment damage. Level note: Evidence: a pilot with measured results over at least 30 days.

Slide 7 L7 Director or founder: Pilot and expand

L7: Director or founder. You can lead: run a team or business in electric car charging station provider and develop others. Focus module: Pilot and expand (Create, 8 h). Prove one site. Key points: Run a 90-day pilot at one site. Measure sessions, kWh, uptime. Stop rule: under 3 sessions a day after 60 days means move or adjust price. Plan roll-out. Set up counters for sessions, kWh, uptime and revenue before day one. Review at day 30, 60 and 90 and adjust price or signs using the data. Write the roll-out plan with site criteria, budget and order.

Speaker notes. Teach: open with the worked example. 5.2 sessions per day; proceed. Over 90 days that is 5.2 x 90 = 468 sessions, and at 28 kWh each, 468 x 28 = 13,104 kWh. The stop rule of 3 sessions a day would be 3 x 90 = 270 sessions, so the site clears it easily. Then set the activity: Run pilot review. Mark against the standard: Review has decision. Check at this level: What triggers a move? Model answer: Under 3 sessions a day after 60 days. Level note: Evidence: a record of results over a year and of people you have coached to a higher level.

jobs this leads to

Where this takes you

  • Charging technician
  • Electrical apprentice
  • Network operations coordinator
  • Site development manager
  • Charging business owner

ten locations and global

Your place

The course is written for Canada. The same method works elsewhere; local rules, currency and levels change. Pick your place.

India (Bengaluru)

Language: English, Hindi, Kannada. Currency: INR. Registering: Udyam (small business) or company registration with the Ministry of Corporate Affairs. Data rule: Digital Personal Data Protection Act 2023. Levels frame to cite: National Skills Qualifications Framework (NSQF) and the national credit framework.

Netherlands (Eindhoven area)

Language: Dutch, English. Currency: EUR. Registering: registration with the Chamber of Commerce (KvK). Data rule: EU GDPR (Dutch: AVG), supervised by the Autoriteit Persoonsgegevens. Levels frame to cite: the Dutch qualification framework (NLQF) linked to the European Qualifications Framework.

UAE (Dubai and Abu Dhabi)

Language: Arabic, English. Currency: AED. Registering: a trade licence from the emirate economic department or a free-zone licence. Data rule: Federal Decree-Law No. 45 of 2021 (personal data protection). Levels frame to cite: the emirate education and training regulators (for example KHDA in Dubai) and the national qualifications framework.

Brazil (Sao Paulo)

Language: Portuguese (Spanish and English support). Currency: BRL. Registering: CNPJ registration, or MEI for micro-entrepreneurs. Data rule: LGPD (Lei Geral de Protecao de Dados). Levels frame to cite: the national technical-education catalogue and the national S-system training bodies.

Canada (Toronto)

Language: English, French. Currency: CAD. Registering: federal or Ontario business registration. Data rule: PIPEDA, with provincial rules where they apply. Levels frame to cite: the provincial colleges framework and the national credential-recognition guidance.

United States

Language: English, Spanish. Currency: USD. Registering: state registration (Secretary of State) and a federal tax ID. Data rule: state privacy laws (for example California), and COPPA for children under 13. Levels frame to cite: state and community-college credit systems.

Singapore

Language: English, Mandarin, Malay, Tamil. Currency: SGD. Registering: registration with ACRA. Data rule: Personal Data Protection Act (PDPA). Levels frame to cite: the Singapore national skills frameworks and the national credit system.

Australia

Language: English. Currency: AUD. Registering: an ABN and, for companies, ASIC registration. Data rule: the Privacy Act 1988 and the Australian Privacy Principles. Levels frame to cite: the Australian Qualifications Framework (AQF) levels.

Hong Kong (Eastern Asia)

Language: Chinese (Cantonese, Mandarin), English. Currency: HKD. Registering: a business registration and, for companies, the Companies Registry. Data rule: the Personal Data (Privacy) Ordinance. Levels frame to cite: the Hong Kong Qualifications Framework.

Georgia and Israel (Western Asia)

Language: Georgian, Hebrew, Arabic, English. Currency: GEL or ILS. Registering: local business registration in the country where you work. Data rule: the personal data law of the country where the learner lives. Levels frame to cite: the national qualifications framework of that country.

Cayman Islands (Caribbean)

Language: English. Currency: KYD. Registering: a trade and business licence or company registration. Data rule: the Data Protection Act. Levels frame to cite: the local education and training framework.

Mexico

Language: Spanish, English. Currency: MXN. Registering: tax registration (RFC) and company or sole-trader registration. Data rule: the federal law on personal data held by private parties. Levels frame to cite: the national competency certification system and the education ministry levels.

next

Draft

Draft flagship course. Own wording. Teaching figures are examples, not market data. Not live.