Run a pilot of construction in Canada: eight modules from user need to review, with rules, costs, risks and a seven-level ladder.

about this course

What you will be able to do

L4 Practitioner8 modules · 58 hConstruction / InfrastructurePhase 1 (2026–2027)
  • Understand Construction builds and repairs homes and other structures.
  • Apply Every job needs a clear scope, a plan and a way to handle changes..
  • Apply Safety comes first.
  • Evaluate Building rules are mostly provincial and municipal.
  • Apply A job must cover its real cost and your risk..
  • Create Good running keeps jobs on time and safe..
  • Evaluate Clear agreements prevent most disputes..
  • Create Risk is part of building.

Task, condition and standard

Task

Run a 30 to 90 day pilot of a small construction offer for real users in Canada and keep a full record.

Condition

About 58 hours over 3 to 6 months. A free spreadsheet, a phone or computer, one mentor, a peer circle and at least five real users. Practice partners are agreed locally.

Standard

Rules table complete with dated sources; cost sheet checked by a mentor; risk register and privacy note written; pilot reviewed with evidence; at least 70% on the ten-question check.

Field: property, construction and smart buildings. Who it is for: students, career changers, returners, newcomers to Canada, small-business starters. Requirements: none. Materials: lesson text, templates, rules table, cost sheet, risk register, rubric, ten-question check with answers.

lesson by lesson

8 modules with worked examples

Module 1 Know the site, the trades and the words 6 hUnderstand

Construction builds and repairs homes and other structures. Start with the roles, the stages and the basic words.

  • Terms: permit, drawing, scope, estimate, tender, subcontractor, inspection, deficiency.
  • Stages: design, permit, site prep, foundation, frame, services, finish, inspection, handover.
  • Trades include carpenters, electricians, plumbers and labourers; some trades need a licence or certificate.
  • Visit a site from outside or with permission and name each trade you see.
  • Read a simple drawing and find the scale, the dimensions and the notes.
  • Learn the common tools by name and by use: tape, level, square, saw, drill, chalk line.
  • Learn the common materials: lumber, concrete, drywall, insulation, roofing, and what each is used for.
Worked example. A deficiency is a small fault found at the end, such as a missing cover plate, that must be fixed before final payment. If a list shows 12 deficiencies and 9 are fixed, 12 - 9 = 3 remain. Final payment waits until all 12 are signed off.

Activity. Write a one-page stage list for a small project, such as a deck, with the trade for each stage.

Standard to meet. Task: list project stages and trades. Condition: for one small project. Standard: all stages in order, terms used correctly, and trades matched to tasks.

Module 2 Explain how a job moves from idea to handover 6 hApply

Every job needs a clear scope, a plan and a way to handle changes.

  • Scope says what is included and what is not. Write it before you price.
  • A schedule shows which tasks come first and which can run together.
  • A change order is a written, priced and agreed change to the scope.
  • Keep a daily log: weather, who was on site, work done, problems.
  • Break a job into tasks and give each a duration in days.
  • Mark tasks that must wait for another, such as framing before wiring.
  • Write who orders materials, who is on site and who signs off each stage.
Worked example. The owner asks for an extra window. You write: 'Add one window, 1,200 CAD, two extra days.' Both sign before work starts. If the job was 2,420 CAD and 10 days, it becomes 2,420 + 1,200 = 3,620 CAD and 12 days.

Activity. Write a scope, a task list with days, and a change order form for a small job.

Standard to meet. Task: write scope, schedule and change form. Condition: for one real or pretend small job. Standard: scope names inclusions and exclusions; schedule has start, end and order of tasks.

Module 3 Do basic site tasks safely and to a standard 10 hApply

Safety comes first. Then do the task to a measured standard.

  • Complete the required safety training before you work on site. Wear the right protective gear.
  • Know the main hazards: falls, cuts, electrical contact, trench collapse and lifting injuries.
  • Measure twice and check level, square and plumb before you fix.
  • Before you dig, request a locate of buried lines through the local call-before-you-dig service.
  • Check that ladders, scaffolds and tools are in good condition before each use.
  • Mark and cut with a pencil line and a square, and check the first cut against the plan.
  • Keep the work area tidy and put offcuts and waste in the right bin at the end of the day.
Worked example. Check square by measuring both diagonals of a frame. A frame 2.4 m by 1.2 m should have both diagonals about 2.68 m. If one reads 2.68 and the other 2.72, the diagonals differ by 4 cm, so the frame is out of square and must be adjusted.

Activity. Build a small practice item, such as a frame or a wall section, under supervision. Check and record measurements.

Standard to meet. Task: build and check a practice item. Condition: supervised, with safety gear. Standard: measurements within the stated tolerance and no safety breaches.

Module 4 Know permits, codes, licences and liens 8 hEvaluate

Building rules are mostly provincial and municipal. Find what applies before you start.

  • Most building work needs a municipal permit and inspections. The building code is set by the province and is based on national model codes. Check with your municipality.
  • Some trades, such as electrical and gas work, require a licensed person. Check with your provincial trades authority.
  • Workplace safety is enforced by a provincial board or ministry. Check the current rules.
  • Construction lien laws let unpaid workers and suppliers claim against a property. Rules and holdback amounts differ by province; check the current law.
  • Ask the municipality which permit your project needs and how long approval takes.
  • List the inspections you must request and the stage at which each one happens.
  • Keep copies of permits, inspection reports and licences on site.
Worked example. Rules table row: 'Basement suite | municipal building office | permit and inspections before closing walls | before work | permit number on site'. If the permit takes 6 weeks and the build takes 8 weeks, the earliest finish is week 14, not week 8.

Activity. Build a rules table for a small project in your city with the enforcer, action and date checked.

Standard to meet. Task: build a rules table. Condition: from official pages. Standard: each row has a dated source; no rule is guessed.

Module 5 Estimate, price and track job costs 8 hApply

A job must cover its real cost and your risk.

  • List materials, labour, equipment, permits, waste and travel. Add a margin for risk and profit.
  • Get written quotes from suppliers and subcontractors.
  • Track actual cost against estimate each week.
  • Do not forget insurance, tools and unpaid time for quoting.
  • Add a contingency for unknowns, such as 10 percent of cost, and say so in the estimate.
  • Include the cost of waste and rework in material quantities.
  • Compare the quote you give with the cost you track, and note the difference on every job.
Worked example. Price 2,420, cost 1,750: margin 670 per job, about 28 percent (670 / 2420). With 9 jobs, margin is 9 x 670 = 6,030 CAD. If a job runs 10 percent over cost (1,925), margin falls to 495. Teaching figures only.

Activity. Estimate a small job with a cost sheet, a price and a plan to track actual cost.

Standard to meet. Task: build an estimate. Condition: current local prices. Standard: units and quantities shown, allowances stated, margin computed, and a mentor checks the arithmetic.

Module 6 Run the site: schedule, people and quality 6 hCreate

Good running keeps jobs on time and safe.

  • Hold a short safety talk at the start of each day.
  • Order materials by lead time so work does not stop.
  • Inspect each stage before the next one covers it.
  • Close out with a list of deficiencies and sign-off.
  • Walk the site at the end of each day for hazards and for materials left out.
  • Check deliveries against the order before you sign.
  • Take dated photos of work before it is covered up.
Worked example. Plumbing is inspected before walls are closed. A failed test is fixed the same day, not hidden. If the fix takes 4 hours and a closed wall would have taken 2 days to reopen, the early check saves 1.5 days or more.

Activity. Run a small project for four weeks with a daily log, stage checks and a close-out list.

Standard to meet. Task: run a small build or repair. Condition: real or training project. Standard: log complete, each stage checked, deficiencies fixed and signed.

Module 7 Win work, write contracts and manage clients 6 hEvaluate

Clear agreements prevent most disputes.

  • A contract states scope, price, payment schedule, start and end dates, change process and warranty.
  • Ask for references and show photos of past work.
  • Keep records of emails, photos and signed changes.
  • Ask a legal adviser to review your contract template.
  • Put the warranty length and what it covers in writing.
  • Send a written summary after each client meeting and ask for a reply.
  • Agree how and when you will be paid before you buy materials.
Worked example. Payment schedule: 20 percent at start, 40 percent at framing, 30 percent at finish, 10 percent after inspection. On a 2,420 CAD job that is 484, 968, 726 and 242, which add to 2,420.

Activity. Write a one-page contract template and a quote letter for a small job.

Standard to meet. Task: draft a contract template and quote. Condition: reviewed by a mentor. Standard: all key terms in plain words; payment steps tied to finished work.

Module 8 Manage risk, pilot a job and grow 8 hCreate

Risk is part of building. Plan for it and prove your system on a real job.

  • Risk register: injury, weather, price rises, late delivery, defects, unpaid invoices.
  • Keep insurance current and cash for slow weeks.
  • Pilot a real small job with a stop rule for cost and time overruns.
  • Write a review and a 12-month plan, including training and hiring.
  • Rank the risks by cost and likelihood, and list a control for each.
  • Write who you call first in an injury, a damage claim or a stop-work order.
  • Plan how you will find and train a helper before you need one.
Worked example. Stop rule: 'If cost passes the estimate by 10 percent, stop and agree a change in writing.' On a 1,750 CAD estimate, the limit is 1,750 x 1.10 = 1,925 CAD. At 1,950, the rule has been passed by 25 CAD and work stops.

Activity. Run the job, write the review and the plan, and present to a panel of three.

Standard to meet. Task: run a pilot job. Condition: licensed or supervised, safe and legal. Standard: costs tracked, no safety breaches, decision supported by numbers.

assessment

How you are checked

Evidence: value statement, rules table, core task record, cost sheet, 4-week log, funnel, risk register and privacy note, pilot review and 12-month plan. A mentor and two peers mark it with this rubric. Pass: no criterion at "Not yet".

Marking rubric
CriterionNot yetMeetsExceeds
Evidence qualityClaims without recordsDated records for claimsEvery claim linked to a dated source or measure
Numbers and unitsMissing units or currencyCorrect with unitsCorrect with a check and what-if cases
Rules and safetyRules guessedRules named with enforcersRules confirmed in writing with the official body
User focusNo real userFive users heardChanges made from user feedback
ReflectionNo lessonsThree lessonsLessons turned into a dated plan

Ten-question check, with model answers

Q1. What is a deficiency?

Model answer: A small fault found at the end that must be fixed. (Covered in module 1: Know the site, the trades and the words. To pass that module: Task: list project stages and trades. Condition: for one small project. Standard: all stages in order, terms used correctly, and trades matched to tasks.)

Q2. What does a scope say?

Model answer: What work is included and what is not. (Covered in module 2: Explain how a job moves from idea to handover. To pass that module: Task: write scope, schedule and change form. Condition: for one real or pretend small job. Standard: scope names inclusions and exclusions; schedule has start, end and order of tasks.)

Q3. What is a change order?

Model answer: A written, priced and agreed change to the work. (Covered in module 2: Explain how a job moves from idea to handover. To pass that module: Task: write scope, schedule and change form. Condition: for one real or pretend small job. Standard: scope names inclusions and exclusions; schedule has start, end and order of tasks.)

Q4. How can you check a frame is square?

Model answer: Measure both diagonals; they should match. (Covered in module 3: Do basic site tasks safely and to a standard. To pass that module: Task: build and check a practice item. Condition: supervised, with safety gear. Standard: measurements within the stated tolerance and no safety breaches.)

Q5. Why call before you dig?

Model answer: To locate buried lines and avoid injury and damage. (Covered in module 3: Do basic site tasks safely and to a standard. To pass that module: Task: build and check a practice item. Condition: supervised, with safety gear. Standard: measurements within the stated tolerance and no safety breaches.)

Q6. Who sets building codes in Canada?

Model answer: The provinces, based on national model codes; the city applies them. (Covered in module 4: Know permits, codes, licences and liens. To pass that module: Task: build a rules table. Condition: from official pages. Standard: each row has a dated source; no rule is guessed.)

Q7. What does a lien law do?

Model answer: Lets unpaid workers or suppliers claim against a property; rules differ by province. (Covered in module 4: Know permits, codes, licences and liens. To pass that module: Task: build a rules table. Condition: from official pages. Standard: each row has a dated source; no rule is guessed.)

Q8. What goes into an estimate?

Model answer: Materials, labour, equipment, permits, waste, travel and margin. (Covered in module 5: Estimate, price and track job costs. To pass that module: Task: build an estimate. Condition: current local prices. Standard: units and quantities shown, allowances stated, margin computed, and a mentor checks the arithmetic.)

Q9. Why inspect before covering work?

Model answer: Hidden faults are costly to fix later. (Covered in module 6: Run the site: schedule, people and quality. To pass that module: Task: run a small build or repair. Condition: real or training project. Standard: log complete, each stage checked, deficiencies fixed and signed.)

Q10. What do you do if you do not know a rule?

Model answer: Ask the municipality or provincial authority and keep the answer in writing. (Covered in module 4: Know permits, codes, licences and liens. To pass that module: Task: build a rules table. Condition: from official pages. Standard: each row has a dated source; no rule is guessed.)

levels

Seven levels, L1 to L7

Seven slides, one per level. Open each for the slide text and the speaker notes.

Slide 1 L1 Built environment aware learner: Know the site, the trades and the words

L1: Built environment aware learner. You can define: name the main terms, people and rules of construction. Focus module: Know the site, the trades and the words (Understand, 6 h). Construction builds and repairs homes and other structures. Start with the roles, the stages and the basic words. Key points: Terms: permit, drawing, scope, estimate, tender, subcontractor, inspection, deficiency. Stages: design, permit, site prep, foundation, frame, services, finish, inspection, handover. Trades include carpenters, electricians, plumbers and labourers; some trades need a licence or certificate. Visit a site from outside or with permission and name each trade you see. Read a simple drawing and find the scale, the dimensions and the notes. Learn the common tools by name and by use: tape, level, square, saw, drill, chalk line. Learn the common materials: lumber, concrete, drywall, insulation, roofing, and what each is used for.

Speaker notes. Teach: open with the worked example. A deficiency is a small fault found at the end, such as a missing cover plate, that must be fixed before final payment. If a list shows 12 deficiencies and 9 are fixed, 12 - 9 = 3 remain. Final payment waits until all 12 are signed off. Then set the activity: Write a one-page stage list for a small project, such as a deck, with the trade for each stage. Mark against the standard: Task: list project stages and trades. Condition: for one small project. Standard: all stages in order, terms used correctly, and trades matched to tasks. Check at this level: What is a deficiency? Model answer: A small fault found at the end that must be fixed. Level note: Start here if new. Evidence: a one-page glossary and a visit or interview note.

Slide 2 L2 Site or office assistant: Explain how a job moves from idea to handover

L2: Site or office assistant. You can describe: explain how construction works from first contact to result. Focus module: Explain how a job moves from idea to handover (Apply, 6 h). Every job needs a clear scope, a plan and a way to handle changes. Key points: Scope says what is included and what is not. Write it before you price. A schedule shows which tasks come first and which can run together. A change order is a written, priced and agreed change to the scope. Keep a daily log: weather, who was on site, work done, problems. Break a job into tasks and give each a duration in days. Mark tasks that must wait for another, such as framing before wiring. Write who orders materials, who is on site and who signs off each stage.

Speaker notes. Teach: open with the worked example. The owner asks for an extra window. You write: 'Add one window, 1,200 CAD, two extra days.' Both sign before work starts. If the job was 2,420 CAD and 10 days, it becomes 2,420 + 1,200 = 3,620 CAD and 12 days. Then set the activity: Write a scope, a task list with days, and a change order form for a small job. Mark against the standard: Task: write scope, schedule and change form. Condition: for one real or pretend small job. Standard: scope names inclusions and exclusions; schedule has start, end and order of tasks. Check at this level: What does a scope say? Model answer: What work is included and what is not. Level note: Evidence: a flow chart and a two-minute spoken explanation.

Slide 3 L3 Tradesperson or coordinator: Do basic site tasks safely and to a standard

L3: Tradesperson or coordinator. You can apply: carry out a routine task in construction to a written standard. Focus module: Do basic site tasks safely and to a standard (Apply, 10 h). Safety comes first. Then do the task to a measured standard. Key points: Complete the required safety training before you work on site. Wear the right protective gear. Know the main hazards: falls, cuts, electrical contact, trench collapse and lifting injuries. Measure twice and check level, square and plumb before you fix. Before you dig, request a locate of buried lines through the local call-before-you-dig service. Check that ladders, scaffolds and tools are in good condition before each use. Mark and cut with a pencil line and a square, and check the first cut against the plan. Keep the work area tidy and put offcuts and waste in the right bin at the end of the day.

Speaker notes. Teach: open with the worked example. Check square by measuring both diagonals of a frame. A frame 2.4 m by 1.2 m should have both diagonals about 2.68 m. If one reads 2.68 and the other 2.72, the diagonals differ by 4 cm, so the frame is out of square and must be adjusted. Then set the activity: Build a small practice item, such as a frame or a wall section, under supervision. Check and record measurements. Mark against the standard: Task: build and check a practice item. Condition: supervised, with safety gear. Standard: measurements within the stated tolerance and no safety breaches. Check at this level: How can you check a frame is square? Model answer: Measure both diagonals; they should match. Level note: Evidence: a supervised task record that meets the standard once.

Slide 4 L4 Supervisor or agent: Know permits, codes, licences and liens

L4: Supervisor or agent. You can analyse: diagnose why a construction result missed its target and fix it. Focus module: Know permits, codes, licences and liens (Evaluate, 8 h). Building rules are mostly provincial and municipal. Find what applies before you start. Key points: Most building work needs a municipal permit and inspections. The building code is set by the province and is based on national model codes. Check with your municipality. Some trades, such as electrical and gas work, require a licensed person. Check with your provincial trades authority. Workplace safety is enforced by a provincial board or ministry. Check the current rules. Construction lien laws let unpaid workers and suppliers claim against a property. Rules and holdback amounts differ by province; check the current law. Ask the municipality which permit your project needs and how long approval takes. List the inspections you must request and the stage at which each one happens. Keep copies of permits, inspection reports and licences on site.

Speaker notes. Teach: open with the worked example. Rules table row: 'Basement suite | municipal building office | permit and inspections before closing walls | before work | permit number on site'. If the permit takes 6 weeks and the build takes 8 weeks, the earliest finish is week 14, not week 8. Then set the activity: Build a rules table for a small project in your city with the enforcer, action and date checked. Mark against the standard: Task: build a rules table. Condition: from official pages. Standard: each row has a dated source; no rule is guessed. Check at this level: Who sets building codes in Canada? Model answer: The provinces, based on national model codes; the city applies them. Level note: Evidence: a fault or gap analysis with a fix and a repeat test. This course targets this level.

Slide 5 L5 Project manager: Run the site: schedule, people and quality

L5: Project manager. You can evaluate: judge options for construction against cost, risk and quality. Focus module: Run the site: schedule, people and quality (Create, 6 h). Good running keeps jobs on time and safe. Key points: Hold a short safety talk at the start of each day. Order materials by lead time so work does not stop. Inspect each stage before the next one covers it. Close out with a list of deficiencies and sign-off. Walk the site at the end of each day for hazards and for materials left out. Check deliveries against the order before you sign. Take dated photos of work before it is covered up.

Speaker notes. Teach: open with the worked example. Plumbing is inspected before walls are closed. A failed test is fixed the same day, not hidden. If the fix takes 4 hours and a closed wall would have taken 2 days to reopen, the early check saves 1.5 days or more. Then set the activity: Run a small project for four weeks with a daily log, stage checks and a close-out list. Mark against the standard: Task: run a small build or repair. Condition: real or training project. Standard: log complete, each stage checked, deficiencies fixed and signed. Check at this level: Why inspect before covering work? Model answer: Hidden faults are costly to fix later. Level note: Evidence: an options paper with numbers and a recommendation defended to a panel.

Slide 6 L6 Development manager: Win work, write contracts and manage clients

L6: Development manager. You can create: design and pilot a new offer or process in construction. Focus module: Win work, write contracts and manage clients (Evaluate, 6 h). Clear agreements prevent most disputes. Key points: A contract states scope, price, payment schedule, start and end dates, change process and warranty. Ask for references and show photos of past work. Keep records of emails, photos and signed changes. Ask a legal adviser to review your contract template. Put the warranty length and what it covers in writing. Send a written summary after each client meeting and ask for a reply. Agree how and when you will be paid before you buy materials.

Speaker notes. Teach: open with the worked example. Payment schedule: 20 percent at start, 40 percent at framing, 30 percent at finish, 10 percent after inspection. On a 2,420 CAD job that is 484, 968, 726 and 242, which add to 2,420. Then set the activity: Write a one-page contract template and a quote letter for a small job. Mark against the standard: Task: draft a contract template and quote. Condition: reviewed by a mentor. Standard: all key terms in plain words; payment steps tied to finished work. Check at this level (this question is covered in module 3: Do basic site tasks safely and to a standard): Why call before you dig? Model answer: To locate buried lines and avoid injury and damage. Level note: Evidence: a pilot with measured results over at least 30 days.

Slide 7 L7 Developer or company director: Manage risk, pilot a job and grow

L7: Developer or company director. You can lead: run a team or business in construction and develop others. Focus module: Manage risk, pilot a job and grow (Create, 8 h). Risk is part of building. Plan for it and prove your system on a real job. Key points: Risk register: injury, weather, price rises, late delivery, defects, unpaid invoices. Keep insurance current and cash for slow weeks. Pilot a real small job with a stop rule for cost and time overruns. Write a review and a 12-month plan, including training and hiring. Rank the risks by cost and likelihood, and list a control for each. Write who you call first in an injury, a damage claim or a stop-work order. Plan how you will find and train a helper before you need one.

Speaker notes. Teach: open with the worked example. Stop rule: 'If cost passes the estimate by 10 percent, stop and agree a change in writing.' On a 1,750 CAD estimate, the limit is 1,750 x 1.10 = 1,925 CAD. At 1,950, the rule has been passed by 25 CAD and work stops. Then set the activity: Run the job, write the review and the plan, and present to a panel of three. Mark against the standard: Task: run a pilot job. Condition: licensed or supervised, safe and legal. Standard: costs tracked, no safety breaches, decision supported by numbers. Check at this level (this question is covered in module 1: Know the site, the trades and the words): What is a deficiency? Model answer: A small fault found at the end that must be fixed. Level note: Evidence: a record of results over a year and of people you have coached to a higher level.

jobs this leads to

Where this takes you

  • Labourer
  • Carpenter apprentice
  • Site coordinator
  • Estimator
  • Project coordinator
  • Small contractor

ten locations and global

Your place

The course is written for Canada. The same method works elsewhere; local rules, currency and levels change. Pick your place.

India (Bengaluru)

Language: English, Hindi, Kannada. Currency: INR. Registering: Udyam (small business) or company registration with the Ministry of Corporate Affairs. Data rule: Digital Personal Data Protection Act 2023. Levels frame to cite: National Skills Qualifications Framework (NSQF) and the national credit framework.

Netherlands (Eindhoven area)

Language: Dutch, English. Currency: EUR. Registering: registration with the Chamber of Commerce (KvK). Data rule: EU GDPR (Dutch: AVG), supervised by the Autoriteit Persoonsgegevens. Levels frame to cite: the Dutch qualification framework (NLQF) linked to the European Qualifications Framework.

UAE (Dubai and Abu Dhabi)

Language: Arabic, English. Currency: AED. Registering: a trade licence from the emirate economic department or a free-zone licence. Data rule: Federal Decree-Law No. 45 of 2021 (personal data protection). Levels frame to cite: the emirate education and training regulators (for example KHDA in Dubai) and the national qualifications framework.

Brazil (Sao Paulo)

Language: Portuguese (Spanish and English support). Currency: BRL. Registering: CNPJ registration, or MEI for micro-entrepreneurs. Data rule: LGPD (Lei Geral de Protecao de Dados). Levels frame to cite: the national technical-education catalogue and the national S-system training bodies.

Canada (Toronto)

Language: English, French. Currency: CAD. Registering: federal or Ontario business registration. Data rule: PIPEDA, with provincial rules where they apply. Levels frame to cite: the provincial colleges framework and the national credential-recognition guidance.

United States

Language: English, Spanish. Currency: USD. Registering: state registration (Secretary of State) and a federal tax ID. Data rule: state privacy laws (for example California), and COPPA for children under 13. Levels frame to cite: state and community-college credit systems.

Singapore

Language: English, Mandarin, Malay, Tamil. Currency: SGD. Registering: registration with ACRA. Data rule: Personal Data Protection Act (PDPA). Levels frame to cite: the Singapore national skills frameworks and the national credit system.

Australia

Language: English. Currency: AUD. Registering: an ABN and, for companies, ASIC registration. Data rule: the Privacy Act 1988 and the Australian Privacy Principles. Levels frame to cite: the Australian Qualifications Framework (AQF) levels.

Hong Kong (Eastern Asia)

Language: Chinese (Cantonese, Mandarin), English. Currency: HKD. Registering: a business registration and, for companies, the Companies Registry. Data rule: the Personal Data (Privacy) Ordinance. Levels frame to cite: the Hong Kong Qualifications Framework.

Georgia and Israel (Western Asia)

Language: Georgian, Hebrew, Arabic, English. Currency: GEL or ILS. Registering: local business registration in the country where you work. Data rule: the personal data law of the country where the learner lives. Levels frame to cite: the national qualifications framework of that country.

Cayman Islands (Caribbean)

Language: English. Currency: KYD. Registering: a trade and business licence or company registration. Data rule: the Data Protection Act. Levels frame to cite: the local education and training framework.

Mexico

Language: Spanish, English. Currency: MXN. Registering: tax registration (RFC) and company or sole-trader registration. Data rule: the federal law on personal data held by private parties. Levels frame to cite: the national competency certification system and the education ministry levels.

next

Draft

Draft flagship course. Own wording. Teaching figures are examples, not market data. Not live.