flagship course
Earthing and Ground Potential Rise
Understand how earthing keeps people safe, what ground potential rise is, and how to review test records.
about this course
What you will be able to do
- Explain why earthing and bonding protect people and equipment.
- Identify the parts of an earthing system on a drawing.
- Calculate a simple ground potential rise from fault current and resistance.
- Evaluate a test record for completeness and plausibility.
- Communicate the risk and the next action to a non-expert.
Task, condition and standard
Task
Mark up a drawing, calculate a simple rise, judge three test records and explain the risk in 60 seconds.
Condition
Sample drawings and records supplied; calculator; mentor review; no live equipment. About 3 weeks part-time.
Standard
All calculations correct with units; every record judged with a reason; the explanation is understood by a non-expert peer.
Safety: this course gives awareness and method. It does not qualify you to design, test or approve an earthing system. Work on live or fault-carrying equipment is done only by authorised, competent people under your local rules.
lesson by lesson
8 modules with worked examples
Module 1 Why we earth: the three jobs 3 hours (180 minutes)Understand
An earthing system gives fault current a safe, low-resistance path back to its source, holds exposed metal near earth potential, and lets protection operate quickly. Three jobs: protect people, protect equipment, keep the supply stable.
- Fault current: when insulation fails, current flows through the fault path. A good earth path makes the current large enough for a protective device to trip quickly.
- Touch voltage: the voltage between a metal part a person touches and the ground under their feet. Step voltage: the voltage between two feet on the ground.
- Bonding: joining metal parts so they rise and fall together, so no dangerous difference appears between them.
- Earthing is not a substitute for protection devices; it makes them work.
Activity. Draw one simple diagram of a fault in a small installation, showing the fault path, the protective device and where touch voltage appears. Label each in plain words.
Standard to meet. Diagram shows a complete loop from source to fault and back; three terms used correctly.
Module 2 Soil and resistance basics 3 hours (180 minutes)Understand
How well current spreads into the ground depends on soil resistivity, electrode size and shape, and moisture.
- Soil resistivity changes with moisture, temperature, salts and layers. Dry sand and rock are poor; moist clay is better. Measure; do not guess.
- Electrode resistance falls as you add length, depth or parallel electrodes, but with diminishing returns. As a rule of thumb, parallel rods spaced about their own length apart overlap less; the engineer decides the spacing.
- Seasonal change: measure in the driest season, or allow a margin.
- Measurement methods are done by a competent person with a calibrated instrument and a written procedure.
Activity. Rank the three sites in a table of soil readings (ohm-metres) against a target resistance and write which one needs the most extra electrode length and why.
Standard to meet. Rank correctly, give a reason that mentions moisture or resistivity, and claim no final design.
Module 3 Parts of an earthing system 3 hours (180 minutes)Apply
Learn the names and purposes of each part and read them on a drawing.
- Earth electrode: rod, plate or buried conductor in contact with soil. Earthing conductor: links the installation to the electrode. Main earthing terminal: the one point where earthing and bonding meet.
- Protective conductor: runs with the circuits to every exposed metal part. Equipotential bonding: links pipes, structural steel and other conductive parts.
- Earth mat or grid: a buried mesh of conductors used at substations to spread current and limit voltages across the site.
- Records: label every connection point, record test dates and results.
Activity. Mark up a sample single-line drawing with the six parts above and give each one sentence.
Standard to meet. Identify all six parts correctly and keep the labels readable.
Module 4 Ground potential rise: what it is 4 hours (240 minutes)Analyse
When a large fault current flows into an earth system, the ground around it rises in voltage compared with a distant point (remote earth). This rise is called ground potential rise.
- Order of magnitude: GPR is roughly the earth fault current that flows into the earth system times the earth system resistance. A small resistance still gives a big voltage at high current.
- Transferred potential: a metal path (a fence, a cable sheath, a pipe) can carry that rise to a remote point and give a shock where none is expected.
- People and the public: GPR near substations and pylon bases is why we separate or bond systems carefully, and why isolation rules exist for communications and pipes entering sites.
- Control methods: lower resistance, grading conductors, insulating or isolating metallic paths, bonding intentionally, limiting fault current and clearing faults fast. Every design is verified by a competent engineer.
Activity. Calculate the rise for three given fault currents and resistances; list two metal paths in a sample site plan that could transfer potential.
Standard to meet. Calculate three results correctly with units, name two transfer paths, and write a short note saying a qualified engineer designs and approves the controls.
Module 5 Reading test results and inspection records 4 hours (240 minutes)Evaluate
You will not design the system, but you must judge whether a record is complete and whether results are plausible.
- A complete record has: date, instrument and calibration date, method, weather and soil condition, positions, values and the person's name.
- Compare to the design target and to the last result. A sudden rise suggests a broken connection or corrosion.
- Visual inspection: corrosion at joints, loose clamps, cut conductors, missing labels.
- Escalate: any result outside the design limit goes to the responsible engineer promptly, as your procedure requires.
Activity. Review three sample records; mark each complete or incomplete, plausible or suspicious, and write the next action.
Standard to meet. Judge three records with reasons, and name the escalation for any suspicious result.
Module 6 Touch and step voltage in practice 3 hours (180 minutes)Analyse
When the ground around an earth system rises in voltage, a person can be exposed between a touched part and the ground, or between two feet. Learn to work out the simple difference and see who is at risk.
- Touch voltage is the voltage of the touched part minus the voltage of the ground where the person stands.
- Step voltage is the difference between the ground voltage at two foot positions; it falls the further you are from the electrode.
- People at greatest risk are those close to fences, poles, pump houses and substations during a fault, especially when wet.
- Controls include grading conductors, insulating surfaces, keeping people away and clearing faults fast. A qualified engineer chooses and approves them.
Activity. Calculate the touch voltage for each of three pairs of readings (part voltage and ground voltage), rank the three by risk and write one control for the worst case.
Standard to meet. Calculate three subtractions correctly with units, let the ranking follow the numbers, name the control, and note that a qualified engineer approves it.
Module 7 Bonding and special locations 3 hours (180 minutes)Apply
Some places need extra care because water, metal and people are close together. Learn where bonding is checked and what a record should show.
- Equipotential bonding links incoming metal pipes, structural steel and other conductive parts so they stay at the same voltage.
- Bathrooms, kitchens, swimming areas, farms, workshops and fuel stores each have their own local rules.
- Check for missing links, loose clamps, painted-over joints and unlabelled conductors.
- Do not make or change bonding yourself unless you are competent and authorised.
Activity. Review a sample workshop plan and list three metal parts that need bonding, then write one line on what you would record for each.
Standard to meet. Name three parts correctly, record what, where and who was told on each record line, and attempt no repair as the reviewer.
Module 8 Safe work, communication and next steps 3 hours (180 minutes)Create
Earthing work is designed, tested and verified only by qualified, authorised people. Your job in this course is awareness, clear records and clear communication.
- Safe isolation and permits come first: test dead before touching any conductor, and never test or open live earth connections without authority.
- Storms and faults: stay away from earth electrodes and fences during faults or lightning.
- Explain to a non-expert in 60 seconds why earthing and bonding matter at home and at work.
- Next courses: selecting a cable, checking a protection setting, preparing a site test record.
Activity. Write and record (or present to a peer) a 60-second explanation, a one-page checklist for reviewing earthing records, and a three-item next-step plan.
Standard to meet. Explain it so that a non-expert peer understands; write a checklist of at least eight items; put dates in the plan.
assessment
How you are checked
Evidence: diagram, calculations, three record reviews, 60-second explanation. A mentor with electrical experience marks it with this rubric. Pass: no criterion at Not yet.
| Criterion | Not yet | Meets | Exceeds |
|---|---|---|---|
| Diagram and terms | Loop incomplete or terms wrong | Complete fault loop with three terms used correctly | Also shows where touch voltage appears and why the device trips |
| Calculations | Missing units or wrong arithmetic | Rise and touch voltage correct with units | Also notes limits of the illustration |
| Record review | Records not judged or reasons missing | Each record marked complete or not and plausible or not, with next action | Also spots trends across records |
| Safety and limits | Claims a design or repair | States that a qualified engineer designs and approves; no live work | Also names the permit and isolation steps |
| Explanation | Not understood by a peer | 60-second explanation understood by a non-expert peer | Also uses a home example and a work example |
Eleven-question check, with model answers
Q1. Name the three jobs of an earthing system.
Model answer: Protect people, protect equipment, keep the supply stable (and let protection operate).
Q2. What is touch voltage?
Model answer: The voltage between a touched metal part and the ground under the person's feet.
Q3. Why measure soil resistivity in the driest season?
Model answer: Resistance is usually highest then, so the result is closer to the worst case.
Q4. What is the main earthing terminal for?
Model answer: The single point where earthing and bonding conductors meet.
Q5. Define ground potential rise.
Model answer: The voltage rise of an earth system compared with remote earth during a fault current.
Q6. Calculate GPR for 2,000 A and 0.4 ohm.
Model answer: About 800 V (2,000 x 0.4); example values only, a qualified engineer designs and verifies the real system.
Q7. What is transferred potential and one example?
Model answer: A metal path carrying the rise elsewhere; example a metal fence or cable sheath.
Q8. Name three items a test record must show.
Model answer: Date, instrument and calibration, method, values, person (any three).
Q9. An example result rose from 2 to 7 ohm. What do you do?
Model answer: Retest, inspect joints, and report to the responsible engineer promptly (example: the same day).
Q10. Who designs and approves earthing controls?
Model answer: A qualified, authorised engineer; this course gives awareness only.
Q11. A metal water pipe enters a workshop and is not linked to the main earthing terminal. What do you do?
Model answer: Record it, tell the responsible engineer, and have a competent person correct it; do not make or change bonding yourself. Bonding links metal parts so they stay at the same voltage, so a person touching two of them is not at risk. (Covered in module 7: Bonding and special locations.)
ladder L1 to L7
Slide by slide, with notes
Seven slides, one for each level. Step in at your level and move up; credits stack.
Slide 1. L1 Basic: Why earth anything
On the slide: L1 Basic · Why earth anything
Notes: Say in plain words what earthing protects. Notes: use a washing machine case as the example; no tools needed.
Slide 2. L2 Awareness: Awareness of danger
On the slide: L2 Awareness · Awareness of danger
Notes: Name touch voltage, step voltage and bonding. Notes: show one drawing and ask where a person could be at risk.
Slide 3. L3 Foundation: Read the parts
On the slide: L3 Foundation · Read the parts
Notes: Identify rod, conductor, main terminal and bonding on a drawing. Notes: check labels are readable and complete.
Slide 4. L4 Practitioner: Calculate a simple rise
On the slide: L4 Practitioner · Calculate a simple rise
Notes: Work out ground potential rise from current and resistance. Notes: 2,000 A at 0.4 ohm is about 800 V (example values); state it is an illustration, not a design.
Slide 5. L5 Specialist: Judge test records
On the slide: L5 Specialist · Judge test records
Notes: Judge whether a record is complete and plausible. Notes: a result rising from 2 to 7 ohm (example values) means retest, inspect and report promptly.
Slide 6. L6 Advanced: Lead an inspection round
On the slide: L6 Advanced · Lead an inspection round
Notes: Plan a round of visual checks and record reviews. Notes: sample three records and mark them complete or incomplete.
Slide 7. L7 Super expert: Advise on an earthing programme
On the slide: L7 Super expert · Advise on an earthing programme
Notes: Write an inspection programme and escalation route for a site. Notes: design and approval stay with a qualified engineer; this course gives awareness only.
jobs this leads to
Where this takes you
- Electrical technician trainee
- Site safety assistant
- Inspection and testing assistant
- Utility field assistant
Next: Selecting a cable, Checking a protection setting, Preparing a site test record.
ten locations and global
Your place
Wiring and earthing rules, colours and test limits differ by place. Always work to your own national code and your employer's procedure.
India (Bengaluru)
Language: English, Hindi, Kannada. Use your national wiring code and the local regulator for electrical safety. Credit frame: National Skills Qualifications Framework (NSQF) and the national credit framework.
Netherlands (Eindhoven area)
Language: Dutch, English. Use your national wiring code and the local regulator for electrical safety. Credit frame: the Dutch qualification framework (NLQF) linked to the European Qualifications Framework.
UAE (Dubai and Abu Dhabi)
Language: Arabic, English. Use your national wiring code and the local regulator for electrical safety. Credit frame: the emirate education and training regulators (for example KHDA in Dubai) and the national qualifications framework.
Brazil (Sao Paulo)
Language: Portuguese (Spanish and English support). Use your national wiring code and the local regulator for electrical safety. Credit frame: the national technical-education catalogue and the national S-system training bodies.
Canada (Toronto)
Language: English, French. Use your national wiring code and the local regulator for electrical safety. Credit frame: the provincial colleges framework and the national credential-recognition guidance.
United States
Language: English, Spanish. Use your national wiring code and the local regulator for electrical safety. Credit frame: state and community-college credit systems.
Singapore
Language: English, Mandarin, Malay, Tamil. Use your national wiring code and the local regulator for electrical safety. Credit frame: the Singapore national skills frameworks and the national credit system.
Australia
Language: English. Use your national wiring code and the local regulator for electrical safety. Credit frame: the Australian Qualifications Framework (AQF) levels.
Hong Kong (Eastern Asia)
Language: Chinese (Cantonese, Mandarin), English. Use your national wiring code and the local regulator for electrical safety. Credit frame: the Hong Kong Qualifications Framework.
Georgia and Israel (Western Asia)
Language: Georgian, Hebrew, Arabic, English. Use your national wiring code and the local regulator for electrical safety. Credit frame: the national qualifications framework of that country.
Cayman Islands (Caribbean)
Language: English. Use your national wiring code and the local regulator for electrical safety. Credit frame: the local education and training framework.
Mexico
Language: Spanish, English. Use your national wiring code and the local regulator for electrical safety. Credit frame: the national competency certification system and the education ministry levels.
next
Draft
Draft flagship. Own wording; topic ideas only from our own reading set. A named engineer must review before publish. Not live.