EU-08 · flagship course

Industrial Activity: Machinery, High-Tech and Process

Map one real or simulated process, find three waste points and propose fixes with numbers and a safety check.

about this course

What you will be able to do

L4 PractitionerAbout 142 hLearning Course, 3-6 months
  • Understand Explain the process, its steps and the hazards at each step.
  • Analyse Break the process into times, waits and waste points.
  • Apply Measure the process on site or on a model and map it with data.
  • Evaluate Judge each fix by its saving, cost and safety effect.
  • Create Produce a fix pack with a payback figure and a 90-day plan.

Task, condition and standard

Task

Map one real or simulated process, find three waste points and propose fixes with numbers and a safety check.

Condition

A real or simulated process, a mentor who knows the site, free tools, currency written on every number. This course teaches process and safety awareness only; the site's safety rules and the local authority come first.

Standard

A mentor reviews the pack; three waste points are shown with measured data; every fix has a safety check; at least 70% on the check; two peer reviews given.

lesson by lesson

8 modules with worked examples

Module 1 Who needs this and how a factory runs 6 hUnderstand

A factory turns inputs into outputs through steps. Each step has people, machines, time and quality checks.

  • Identify a process of 6 to 10 steps.
  • Inputs, steps, outputs, scrap, rework, waiting.
  • A manager cares about cost, time, quality, safety.
  • Use a public description or a simulation if you cannot visit.
Worked example. Packing line: cut → assemble → test → pack. 40 units an hour at best; 31 on average.

Activity. Interview three people and write the problems they complain about.

Standard to meet. Conduct three interviews and choose one process.

Module 2 Industrial safety first 6 hAnalyse

Safety comes before output. Stop the machine if a guard is missing.

  • Guards on moving parts; lock-out before repair; trained operators only.
  • Noise, dust, heat, lifting, walkways.
  • You do not operate machinery in this course; you observe and analyse.
  • Follow the site rules and wear required protection when visiting.
Worked example. Hazard list for a cutting step: blade, noise, dust, manual lifting. Controls: fixed guard, ear protection, extraction, lifting aid.

Activity. Write a hazard and control table for each step.

Standard to meet. Give every step hazards and controls.

Module 3 Map the process 35 hApply

Write each step, who does it, minutes per unit, waits and scrap.

  • Use a simple flow chart.
  • Time each step at least 10 times and take the average.
  • Waiting between steps is often the biggest waste.
  • Count scrap at each step.
Worked example. Step times (min): cut 2.0, assemble 3.5, test 1.5, pack 1.0; waiting before assemble 4.0; scrap 6% at assemble.

Activity. Map your process with measured times.

Standard to meet. Map has times, waits and scrap for every step.

Module 4 Quality tools 10 hApply

Count problems, rank them, find the cause.

  • Check sheet: tally defects by type.
  • Pareto chart: bar chart ordered by size; 80% of trouble often comes from 20% of causes.
  • Five whys: ask why five times to reach a root cause.
  • Measure before and after any change.
Worked example. Defects in a week: wrong size 42, scratches 18, missing part 9, other 6. Wrong size is 56% of defects. Five whys: wrong size ← gauge worn ← no check schedule ← no owner.

Activity. Collect defect data for 50 units; draw the chart; do five whys on the top cause.

Standard to meet. Chart correct; root cause found.

Module 5 Find the three waste points 35 hAnalyse

Waste types: waiting, rework, motion, over-production, scrap, stoppages, extra steps.

  • Rank by cost.
  • Use measured data not opinion.
  • Write a problem statement with numbers.
  • Check that the waste is real by observing again.
Worked example. Waste: waiting 4.0 min per unit (33% of the 12.0 min total), scrap 6% at assemble, stoppages 35 min a day.

Activity. Write three problem statements with numbers.

Standard to meet. Give each a measurement and a cost.

Module 6 Maintenance basics 14 hEvaluate

Small regular jobs prevent large failures.

  • Preventive maintenance: cleaning, lubricating, checking, replacing parts on a schedule.
  • Record every job and every breakdown.
  • Look for repeating causes.
  • Lock-out and permission before any repair; only trained staff repair.
Worked example. Gauge check each shift cuts wrong-size defects from 42 to 12 in a week.

Activity. Write a one-page maintenance check list for a machine.

Standard to meet. List is safe, specific and has owners.

Module 7 Propose fixes with numbers 28 hCreate

Fixes need costs, benefits and safety checks.

  • Fix, cost, time to do, benefit per month, payback = cost ÷ benefit.
  • Test small first.
  • Consider safety effects of the change.
  • Get agreement from the process owner.
Worked example. Fix: move parts closer, cost EUR 150; saves 0.8 min per unit; at 1,000 units a month = 800 minutes ≈ 13.3 hours; at labour cost EUR 6 per hour = EUR 80 a month; payback 1.9 months.

Activity. Write three fix proposals with payback.

Standard to meet. Give each cost, benefit, payback and a safety note.

Module 8 Review room and next step 8 hCreate

Present and check.

  • Show map, waste, fixes, safety.
  • Peer feedback.
  • Take the check.
  • Next: Construction or Trading.
Worked example. Score sheet, each line marked 0 to 5 (3 or more meets the standard): process map 5, waste analysis 4, safety 5, fixes 3, evidence 4. Total 21 of 25 = 84%, above the 70% line. Fixes at 3 is the weakest line, so it gets a costed payback figure next.

Activity. Present for 8 minutes, then answer: which waste was largest in minutes, which fix you would do first, and what could go wrong with it.

Standard to meet. Score all rubric lines at 3 or more and give the weakest line a dated fix.

assessment

How you are checked

Evidence: your practice file, data and decision. A mentor and a peer mark it.

Marking rubric
CriterionNot yetMeetsExceeds
Process mapSteps missingAll steps with timesSteps, times, scrap and waits verified on site
Waste analysisOpinion onlyThree wastes with dataPareto and root causes
SafetyNot consideredHazards listedControls proposed and checked
FixesVagueSpecific with numbersCosted with payback
EvidencePhotos onlyMeasured dataBefore and after data

Ten-question check, with model answers

Q1. Name four wastes.

Model answer: Waiting, rework, motion, over-production, scrap or stoppages. (Covered in module 5: Find the three waste points. To pass that module: Give each a measurement and a cost.)

Q2. What is a Pareto chart?

Model answer: A bar chart ordered by size to show the biggest causes. (Covered in module 4: Quality tools. To pass that module: Chart correct; root cause found.)

Q3. What are the five whys?

Model answer: Asking why five times to reach a root cause. (Covered in module 4: Quality tools. To pass that module: Chart correct; root cause found.)

Q4. Payback if cost is EUR 150 and benefit EUR 80 a month?

Model answer: About 1.9 months. (Covered in module 7: Propose fixes with numbers. To pass that module: Give each cost, benefit, payback and a safety note.)

Q5. What must happen before repairing a machine?

Model answer: Lock-out and permission; only trained staff repair. (Covered in module 6: Maintenance basics. To pass that module: List is safe, specific and has owners.)

Q6. Why time each step many times?

Model answer: To get a reliable average. (Covered in module 3: Map the process. To pass that module: Map has times, waits and scrap for every step.)

Q7. What do you do if a guard is missing?

Model answer: Stop the machine and report it. (Covered in module 2: Industrial safety first. To pass that module: Give every step hazards and controls.)

Q8. Name one preventive maintenance job.

Model answer: Clean, lubricate, check or replace a part on a schedule. (Covered in module 6: Maintenance basics. To pass that module: List is safe, specific and has owners.)

Q9. Why measure before and after?

Model answer: To show the fix worked. (Covered in module 4: Quality tools. To pass that module: Chart correct; root cause found.)

Q10. Do you operate machines in this course?

Model answer: No: you observe and analyse only. (Covered in module 2: Industrial safety first. To pass that module: Give every step hazards and controls.)

ladder L1 to L7

Slide by slide, with notes

Seven slides, one for each level. Step in at your level and move up; credits stack.

Slide 1. L1 Basic: How a factory runs

On the slide: L1 Basic · How a factory runs. Focus module: Who needs this and how a factory runs (Understand, 6 h). A factory turns inputs into outputs through steps. Each step has people, machines, time and quality checks. Key points: Identify a process of 6 to 10 steps. Inputs, steps, outputs, scrap, rework, waiting. A manager cares about cost, time, quality, safety. Use a public description or a simulation if you cannot visit.

Notes: Describe cut, assemble, test and pack. Notes: 40 units an hour at best and 31 on average. Teach: open with the worked example. Packing line: cut → assemble → test → pack. 40 units an hour at best; 31 on average. Then set the activity: Interview three people and write the problems they complain about. Mark against the standard: Conduct three interviews and choose one process.

Slide 2. L2 Awareness: Industrial safety

On the slide: L2 Awareness · Industrial safety. Focus module: Industrial safety first (Analyse, 6 h). Safety comes before output. Stop the machine if a guard is missing. Key points: Guards on moving parts; lock-out before repair; trained operators only. Noise, dust, heat, lifting, walkways. You do not operate machinery in this course; you observe and analyse. Follow the site rules and wear required protection when visiting.

Notes: List hazards and controls for one step. Notes: blade, noise, dust and lifting need a guard, ear protection, extraction and lifting rules. Teach: open with the worked example. Hazard list for a cutting step: blade, noise, dust, manual lifting. Controls: fixed guard, ear protection, extraction, lifting aid. Then set the activity: Write a hazard and control table for each step. Mark against the standard: Give every step hazards and controls. Check at this level: What do you do if a guard is missing? Model answer: Stop the machine and report it.

Slide 3. L3 Foundation: Map a process

On the slide: L3 Foundation · Map a process. Focus module: Map the process (Apply, 35 h). Write each step, who does it, minutes per unit, waits and scrap. Key points: Use a simple flow chart. Time each step at least 10 times and take the average. Waiting between steps is often the biggest waste. Count scrap at each step.

Notes: Time each step. Notes: cut 2.0, assemble 3.5, test 1.5, pack 1.0 and 4.0 of waiting. Teach: open with the worked example. Step times (min): cut 2.0, assemble 3.5, test 1.5, pack 1.0; waiting before assemble 4.0; scrap 6% at assemble. Then set the activity: Map your process with measured times. Mark against the standard: Map has times, waits and scrap for every step. Check at this level: Why time each step many times? Model answer: To get a reliable average.

Slide 4. L4 Practitioner: Quality tools

On the slide: L4 Practitioner · Quality tools. Focus module: Quality tools (Apply, 10 h). Count problems, rank them, find the cause. Key points: Check sheet: tally defects by type. Pareto chart: bar chart ordered by size; 80% of trouble often comes from 20% of causes. Five whys: ask why five times to reach a root cause. Measure before and after any change.

Notes: Count defects and rank them. Notes: wrong size 42, scratches 18, missing part 9, other 6; wrong size is 56 per cent. Teach: open with the worked example. Defects in a week: wrong size 42, scratches 18, missing part 9, other 6. Wrong size is 56% of defects. Five whys: wrong size ← gauge worn ← no check schedule ← no owner. Then set the activity: Collect defect data for 50 units; draw the chart; do five whys on the top cause. Mark against the standard: Chart correct; root cause found. Check at this level: What is a Pareto chart? Model answer: A bar chart ordered by size to show the biggest causes.

Slide 5. L5 Specialist: Find waste

On the slide: L5 Specialist · Find waste. Focus module: Find the three waste points (Analyse, 35 h). Waste types: waiting, rework, motion, over-production, scrap, stoppages, extra steps. Key points: Rank by cost. Use measured data not opinion. Write a problem statement with numbers. Check that the waste is real by observing again.

Notes: Find the three waste points. Notes: waiting is 33 per cent of the 12.0 minute total, scrap 6 per cent and stoppages 35 minutes a day. Teach: open with the worked example. Waste: waiting 4.0 min per unit (33% of the 12.0 min total), scrap 6% at assemble, stoppages 35 min a day. Then set the activity: Write three problem statements with numbers. Mark against the standard: Give each a measurement and a cost. Check at this level: Name four wastes. Model answer: Waiting, rework, motion, over-production, scrap or stoppages.

Slide 6. L6 Advanced: Maintenance and fixes

On the slide: L6 Advanced · Maintenance and fixes. Focus module: Maintenance basics (Evaluate, 14 h). Small regular jobs prevent large failures. Key points: Preventive maintenance: cleaning, lubricating, checking, replacing parts on a schedule. Record every job and every breakdown. Look for repeating causes. Lock-out and permission before any repair; only trained staff repair.

Notes: Propose a fix with numbers. Notes: a gauge check cut wrong-size defects from 42 to 12; moving parts saves 0.8 minutes a unit. Teach: open with the worked example. Gauge check each shift cuts wrong-size defects from 42 to 12 in a week. Then set the activity: Write a one-page maintenance check list for a machine. Mark against the standard: List is safe, specific and has owners. Check at this level: What must happen before repairing a machine? Model answer: Lock-out and permission; only trained staff repair.

Slide 7. L7 Super expert: Design a process improvement

On the slide: L7 Super expert · Design a process improvement. Focus module: Propose fixes with numbers (Create, 28 h). Fixes need costs, benefits and safety checks. Key points: Fix, cost, time to do, benefit per month, payback = cost ÷ benefit. Test small first. Consider safety effects of the change. Get agreement from the process owner.

Notes: Present a plan with cost and payback. Notes: 800 minutes saved a month at 1,000 units; compare with the EUR 150 cost. Teach: open with the worked example. Fix: move parts closer, cost EUR 150; saves 0.8 min per unit; at 1,000 units a month = 800 minutes ≈ 13.3 hours; at labour cost EUR 6 per hour = EUR 80 a month; payback 1.9 months. Then set the activity: Write three fix proposals with payback. Mark against the standard: Give each cost, benefit, payback and a safety note. Check at this level: Payback if cost is EUR 150 and benefit EUR 80 a month? Model answer: About 1.9 months.

jobs this leads to

Where this takes you

  • Production operator or line assistant
  • Quality inspector trainee
  • Maintenance assistant
  • Process improvement assistant
  • Industrial safety assistant (with further training)

ten locations and global

Your place

Use local units, rules and authorities.

India (Bengaluru)

Language: English, Hindi, Kannada. Currency: INR. Business set-up: Udyam (small business) or company registration with the Ministry of Corporate Affairs. Personal data: Digital Personal Data Protection Act 2023. Product and food rules: FSSAI.

Netherlands (Eindhoven area)

Language: Dutch, English. Currency: EUR. Business set-up: registration with the Chamber of Commerce (KvK). Personal data: EU GDPR (Dutch: AVG), supervised by the Autoriteit Persoonsgegevens. Product and food rules: NVWA.

UAE (Dubai and Abu Dhabi)

Language: Arabic, English. Currency: AED. Business set-up: a trade licence from the emirate economic department or a free-zone licence. Personal data: Federal Decree-Law No. 45 of 2021 (personal data protection). Product and food rules: the municipality food-control team (for example Dubai Municipality).

Brazil (Sao Paulo)

Language: Portuguese (Spanish and English support). Currency: BRL. Business set-up: CNPJ registration, or MEI for micro-entrepreneurs. Personal data: LGPD (Lei Geral de Protecao de Dados). Product and food rules: ANVISA and MAPA.

Canada (Toronto)

Language: English, French. Currency: CAD. Business set-up: federal or Ontario business registration. Personal data: PIPEDA, with provincial rules where they apply. Product and food rules: the Canadian Food Inspection Agency (CFIA).

United States

Language: English, Spanish. Currency: USD. Business set-up: state registration (Secretary of State) and a federal tax ID. Personal data: state privacy laws (for example California), and COPPA for children under 13. Product and food rules: the FDA and the state health department.

Singapore

Language: English, Mandarin, Malay, Tamil. Currency: SGD. Business set-up: registration with ACRA. Personal data: Personal Data Protection Act (PDPA). Product and food rules: the Singapore Food Agency (SFA).

Australia

Language: English. Currency: AUD. Business set-up: an ABN and, for companies, ASIC registration. Personal data: the Privacy Act 1988 and the Australian Privacy Principles. Product and food rules: Food Standards Australia New Zealand (FSANZ) and the state health authority.

Hong Kong (Eastern Asia)

Language: Chinese (Cantonese, Mandarin), English. Currency: HKD. Business set-up: a business registration and, for companies, the Companies Registry. Personal data: the Personal Data (Privacy) Ordinance. Product and food rules: the Centre for Food Safety.

Georgia and Israel (Western Asia)

Language: Georgian, Hebrew, Arabic, English. Currency: GEL or ILS. Business set-up: local business registration in the country where you work. Personal data: the personal data law of the country where the learner lives. Product and food rules: the national food-safety authority.

Cayman Islands (Caribbean)

Language: English. Currency: KYD. Business set-up: a trade and business licence or company registration. Personal data: the Data Protection Act. Product and food rules: the public health authority.

Mexico

Language: Spanish, English. Currency: MXN. Business set-up: tax registration (RFC) and company or sole-trader registration. Personal data: the federal law on personal data held by private parties. Product and food rules: the federal health-risk authority.

next

Draft

Draft flagship. Own wording. Process and safety awareness only; no professional advice. Not live.