Back

EU-09 · flagship course

Construction and Built Environment

Prepare a bill of quantities, a cost estimate and a safety plan for one small real or model project.

about this course

What you will be able to do

L4 PractitionerAbout 142 hLearning Course, 3-6 months
  • Understand Explain how a drawing, a bill of quantities and a safety plan fit together.
  • Analyse Break the project into elements, quantities and hazards.
  • Apply Measure quantities from the drawing and price them with stated rates.
  • Evaluate Judge the estimate against its tolerance, contingency and exclusions.
  • Create Produce a bill of quantities, estimate and safety plan, with a 90-day plan.

Task, condition and standard

Task

Prepare a bill of quantities, a cost estimate and a safety plan for one small real or model project.

Condition

One small real or model project with a drawing, a mentor who knows site work, free tools, currency written on every number. This course teaches process and safety awareness only; building codes and the local authority set the rules.

Standard

A mentor reviews the pack; quantities are within 5% of a second person's count; the safety plan names the hazards of this project; at least 70% on the check; two peer reviews given.

lesson by lesson

8 modules with worked examples

Module 1 Find the client and the job 6 hUnderstand

Small clients want a clear price, a safe site and a job finished on time.

  • Observe small jobs from the public footpath only; never enter a site without permission.
  • Note materials, price per square metre, time taken and safety measures.
  • Talk to three builders or owners.
  • Choose a small project: a 3 m × 4 m room extension or a boundary wall.
Worked example. Local price for a simple 12 m² room extension: EUR 600 to 900 per m².

Activity. Write a one-page brief with scope and assumptions.

Standard to meet. Write a clear scope with exclusions.

Module 2 Site safety 6 hAnalyse

The main causes of harm are falls, falling objects, digging, electricity, lifting, dust and noise.

  • Plan controls for each hazard.
  • Use protective equipment; hold a short talk before work; stop work if unsafe.
  • Keep walkways clear and tools stored.
  • You only plan and observe; people work on site only with proper training and permission.
Worked example. Falls: edge protection and safe access. Digging: mark services and keep edges stable. Lifting: use correct equipment and a team lift for heavy loads (check the local weight limit).

Activity. Write a task-by-task safety plan for your project.

Standard to meet. List hazards and controls for each task.

Module 3 Read the drawing 35 hApply

A drawing tells what to build, where and with what.

  • Scale, plan, section, elevation, symbols and notes.
  • Check dimensions add up.
  • List work items: excavation, foundation, walls, roof, finishes.
  • Raise queries when the drawing is unclear.
Worked example. Plan 3 m × 4 m. Wall height 2.7 m. Door 0.9 × 2.1, window 1.2 × 1.2.

Activity. Read your drawing and write a list of work items.

Standard to meet. List matches the drawing.

Module 4 Measure quantities 10 hApply

Quantity = length × width × height for volumes, length × width for areas.

  • Excavation volume, concrete volume, wall area less openings, plaster area.
  • Add waste: 5 to 10% for many materials.
  • Use consistent units.
  • Check your totals twice.
Worked example. Wall area: perimeter 14 m × 2.7 m = 37.8 m²; less door 1.89 and window 1.44 = 34.47 m².

Activity. Build a bill of quantities table.

Standard to meet. Calculate a result within 5% of a peer's result.

Module 5 Cost estimating 35 hAnalyse

Cost = quantity × rate. Add labour, equipment, delivery, overhead and contingency.

  • Use local rates and note the source and date.
  • Contingency 5 to 10% for unknowns.
  • State what is not included.
  • Compare with local price per m².
Worked example. Wall plaster 34.47 m² × EUR 6 = EUR 206.8; masonry 34.47 × EUR 25 = EUR 861.8; total of all items EUR 9,420; overhead 10% = EUR 942; contingency 5% = EUR 471; total EUR 10,833.

Activity. Price the bill of quantities.

Standard to meet. Give every line a rate and currency, and list exclusions.

Module 6 Quality and programme 14 hEvaluate

Quality means built to the drawing and standard.

  • Check list: level, plumb, dimensions, finish.
  • Tolerances: write the allowed error.
  • Programme: order of work and days.
  • Record problems and fixes.
Worked example. Wall plumb tolerance ±5 mm over 2 m; measured by spirit level.

Activity. Write a checklist and a simple programme in days.

Standard to meet. Add tolerances to the checklist and keep the programme realistic.

Module 7 Cost control and handover 28 hCreate

Keep cost within budget.

  • Compare actual to estimate weekly.
  • Variation: record changes and cost.
  • Handover pack: drawings, certificates, guarantees.
  • Defects list.
Worked example. Week 3: spent EUR 3,200 vs plan EUR 3,000: investigate the 6.7% overspend.

Activity. Build a cost tracking sheet.

Standard to meet. Show plan vs actual on the sheet.

Module 8 Review room and next step 8 hCreate

Present and check.

  • Show drawing, BOQ, cost, safety, quality.
  • Peer feedback.
  • Take the check.
  • Next: Industrial or Agriculture.
Worked example. Score sheet, each line marked 0 to 5 (3 or more meets the standard): drawing reading 4, quantities 4, cost 5, safety plan 3, quality 4. Total 20 of 25 = 80%, above the 70% line. Safety plan at 3 is the weakest line, so it gets a task-specific hazard list next.

Activity. Present for 8 minutes, then answer: which quantity was hardest to measure, how much contingency you kept and why, and which hazard worries you most.

Standard to meet. Score all rubric lines at 3 or more and give the weakest line a dated fix.

assessment

How you are checked

Evidence: your practice file, data and decision. A mentor and a peer mark it.

Marking rubric
CriterionNot yetMeetsExceeds
Drawing readingMisread dimensionsDimensions checkedDimensions checked and queries raised
QuantitiesLarge errorsWithin 5%Within 2% with waste allowance
CostNo ratesRates and totalsRates, contingency and exclusions stated
Safety planGenericHazards and controlsTask-specific plan with talk record
QualityNot shownChecklistChecklist with tolerances

Ten-question check, with model answers

Q1. Main causes of site harm?

Model answer: Falls, falling objects, digging, electricity, lifting, dust and noise. (Covered in module 2: Site safety. To pass that module: List hazards and controls for each task.)

Q2. Wall area 14 m × 2.7 m minus 3.33 m² openings?

Model answer: 34.47 m². (Covered in module 4: Measure quantities. To pass that module: Calculate a result within 5% of a peer's result.)

Q3. Why add a contingency?

Model answer: For unknowns and price changes. (Covered in module 5: Cost estimating. To pass that module: Give every line a rate and currency, and list exclusions.)

Q4. What is a tolerance?

Model answer: The allowed error in a measurement. (Covered in module 6: Quality and programme. To pass that module: Add tolerances to the checklist and keep the programme realistic.)

Q5. Name three drawing types.

Model answer: Plan, section and elevation. (Covered in module 3: Read the drawing. To pass that module: List matches the drawing.)

Q6. Why state exclusions?

Model answer: So the client knows what is not in the price. (Covered in module 5: Cost estimating. To pass that module: Give every line a rate and currency, and list exclusions.)

Q7. What is waste allowance?

Model answer: Extra material for cuts and loss, often 5 to 10%. (Covered in module 4: Measure quantities. To pass that module: Calculate a result within 5% of a peer's result.)

Q8. What if the drawing is unclear?

Model answer: Raise a query before pricing or building. (Covered in module 3: Read the drawing. To pass that module: List matches the drawing.)

Q9. Do you work on site in this course?

Model answer: No: only plan and observe; work needs training and permission. (Covered in module 2: Site safety. To pass that module: List hazards and controls for each task.)

Q10. What should the safety talk cover?

Model answer: Today's tasks, hazards and controls. (Covered in module 2: Site safety. To pass that module: List hazards and controls for each task.)

ladder L1 to L7

Slide by slide, with notes

Seven slides, one for each level. Step in at your level and move up; credits stack.

Slide 1. L1 Basic: What construction work is

On the slide: L1 Basic · What construction work is. Focus module: Find the client and the job (Understand, 6 h). Small clients want a clear price, a safe site and a job finished on time. Key points: Observe small jobs from the public footpath only; never enter a site without permission. Note materials, price per square metre, time taken and safety measures. Talk to three builders or owners. Choose a small project: a 3 m × 4 m room extension or a boundary wall.

Notes: Describe the people and stages of a small job. Notes: use a 12 square metre room. Teach: open with the worked example. Local price for a simple 12 m² room extension: EUR 600 to 900 per m². Then set the activity: Write a one-page brief with scope and assumptions. Mark against the standard: Write a clear scope with exclusions.

Slide 2. L2 Awareness: Site safety

On the slide: L2 Awareness · Site safety. Focus module: Site safety (Analyse, 6 h). The main causes of harm are falls, falling objects, digging, electricity, lifting, dust and noise. Key points: Plan controls for each hazard. Use protective equipment; hold a short talk before work; stop work if unsafe. Keep walkways clear and tools stored. You only plan and observe; people work on site only with proper training and permission.

Notes: Name the main site hazards. Notes: falls, digging and lifting each need a control. Teach: open with the worked example. Falls: edge protection and safe access. Digging: mark services and keep edges stable. Lifting: use correct equipment and a team lift for heavy loads (check the local weight limit). Then set the activity: Write a task-by-task safety plan for your project. Mark against the standard: List hazards and controls for each task. Check at this level: Main causes of site harm? Model answer: Falls, falling objects, digging, electricity, lifting, dust and noise.

Slide 3. L3 Foundation: Read a drawing

On the slide: L3 Foundation · Read a drawing. Focus module: Read the drawing (Apply, 35 h). A drawing tells what to build, where and with what. Key points: Scale, plan, section, elevation, symbols and notes. Check dimensions add up. List work items: excavation, foundation, walls, roof, finishes. Raise queries when the drawing is unclear.

Notes: Read a plan and take measurements. Notes: a 3 m by 4 m room with 2.7 m walls, a door and a window. Teach: open with the worked example. Plan 3 m × 4 m. Wall height 2.7 m. Door 0.9 × 2.1, window 1.2 × 1.2. Then set the activity: Read your drawing and write a list of work items. Mark against the standard: List matches the drawing. Check at this level: Name three drawing types. Model answer: Plan, section and elevation.

Slide 4. L4 Practitioner: Measure quantities

On the slide: L4 Practitioner · Measure quantities. Focus module: Measure quantities (Apply, 10 h). Quantity = length × width × height for volumes, length × width for areas. Key points: Excavation volume, concrete volume, wall area less openings, plaster area. Add waste: 5 to 10% for many materials. Use consistent units. Check your totals twice.

Notes: Work out wall area. Notes: perimeter 14 m x 2.7 m is 37.8 square metres less door 1.89 and window 1.44, giving 34.47. Teach: open with the worked example. Wall area: perimeter 14 m × 2.7 m = 37.8 m²; less door 1.89 and window 1.44 = 34.47 m². Then set the activity: Build a bill of quantities table. Mark against the standard: Calculate a result within 5% of a peer's result. Check at this level: Wall area 14 m × 2.7 m minus 3.33 m² openings? Model answer: 34.47 m².

Slide 5. L5 Specialist: Estimate cost

On the slide: L5 Specialist · Estimate cost. Focus module: Cost estimating (Analyse, 35 h). Cost = quantity × rate. Add labour, equipment, delivery, overhead and contingency. Key points: Use local rates and note the source and date. Contingency 5 to 10% for unknowns. State what is not included. Compare with local price per m².

Notes: Cost items, overheads and profit. Notes: plaster 34.47 x EUR 6 is EUR 206.8; masonry 34.47 x EUR 25 is EUR 861.8; total all items to EUR 9,420. Teach: open with the worked example. Wall plaster 34.47 m² × EUR 6 = EUR 206.8; masonry 34.47 × EUR 25 = EUR 861.8; total of all items EUR 9,420; overhead 10% = EUR 942; contingency 5% = EUR 471; total EUR 10,833. Then set the activity: Price the bill of quantities. Mark against the standard: Give every line a rate and currency, and list exclusions. Check at this level: Why add a contingency? Model answer: For unknowns and price changes.

Slide 6. L6 Advanced: Control quality and cost

On the slide: L6 Advanced · Control quality and cost. Focus module: Quality and programme (Evaluate, 14 h). Quality means built to the drawing and standard. Key points: Check list: level, plumb, dimensions, finish. Tolerances: write the allowed error. Programme: order of work and days. Record problems and fixes.

Notes: Check tolerance and spend. Notes: plumb tolerance 5 mm over 2 m; EUR 3,200 spent against EUR 3,000 is a 6.7 per cent overspend. Teach: open with the worked example. Wall plumb tolerance ±5 mm over 2 m; measured by spirit level. Then set the activity: Write a checklist and a simple programme in days. Mark against the standard: Add tolerances to the checklist and keep the programme realistic. Check at this level: What is a tolerance? Model answer: The allowed error in a measurement.

Slide 7. L7 Super expert: Plan a small build

On the slide: L7 Super expert · Plan a small build. Focus module: Cost control and handover (Create, 28 h). Keep cost within budget. Key points: Compare actual to estimate weekly. Variation: record changes and cost. Handover pack: drawings, certificates, guarantees. Defects list.

Notes: Present a programme, cost and handover for a job. Notes: price against EUR 600 to 900 per square metre. Teach: open with the worked example. Week 3: spent EUR 3,200 vs plan EUR 3,000: investigate the 6.7% overspend. Then set the activity: Build a cost tracking sheet. Mark against the standard: Show plan vs actual on the sheet.

jobs this leads to

Where this takes you

  • Site assistant or helper
  • Quantity or estimating assistant
  • Junior site supervisor (with further training)
  • Safety officer trainee
  • Small contractor or renovation planner

ten locations and global

Your place

Use local units, rules and authorities.

India (Bengaluru)

Language: English, Hindi, Kannada. Currency: INR. Business set-up: Udyam (small business) or company registration with the Ministry of Corporate Affairs. Personal data: Digital Personal Data Protection Act 2023. Product and food rules: FSSAI.

Netherlands (Eindhoven area)

Language: Dutch, English. Currency: EUR. Business set-up: registration with the Chamber of Commerce (KvK). Personal data: EU GDPR (Dutch: AVG), supervised by the Autoriteit Persoonsgegevens. Product and food rules: NVWA.

UAE (Dubai and Abu Dhabi)

Language: Arabic, English. Currency: AED. Business set-up: a trade licence from the emirate economic department or a free-zone licence. Personal data: Federal Decree-Law No. 45 of 2021 (personal data protection). Product and food rules: the municipality food-control team (for example Dubai Municipality).

Brazil (Sao Paulo)

Language: Portuguese (Spanish and English support). Currency: BRL. Business set-up: CNPJ registration, or MEI for micro-entrepreneurs. Personal data: LGPD (Lei Geral de Protecao de Dados). Product and food rules: ANVISA and MAPA.

Canada (Toronto)

Language: English, French. Currency: CAD. Business set-up: federal or Ontario business registration. Personal data: PIPEDA, with provincial rules where they apply. Product and food rules: the Canadian Food Inspection Agency (CFIA).

United States

Language: English, Spanish. Currency: USD. Business set-up: state registration (Secretary of State) and a federal tax ID. Personal data: state privacy laws (for example California), and COPPA for children under 13. Product and food rules: the FDA and the state health department.

Singapore

Language: English, Mandarin, Malay, Tamil. Currency: SGD. Business set-up: registration with ACRA. Personal data: Personal Data Protection Act (PDPA). Product and food rules: the Singapore Food Agency (SFA).

Australia

Language: English. Currency: AUD. Business set-up: an ABN and, for companies, ASIC registration. Personal data: the Privacy Act 1988 and the Australian Privacy Principles. Product and food rules: Food Standards Australia New Zealand (FSANZ) and the state health authority.

Hong Kong (Eastern Asia)

Language: Chinese (Cantonese, Mandarin), English. Currency: HKD. Business set-up: a business registration and, for companies, the Companies Registry. Personal data: the Personal Data (Privacy) Ordinance. Product and food rules: the Centre for Food Safety.

Georgia and Israel (Western Asia)

Language: Georgian, Hebrew, Arabic, English. Currency: GEL or ILS. Business set-up: local business registration in the country where you work. Personal data: the personal data law of the country where the learner lives. Product and food rules: the national food-safety authority.

Cayman Islands (Caribbean)

Language: English. Currency: KYD. Business set-up: a trade and business licence or company registration. Personal data: the Data Protection Act. Product and food rules: the public health authority.

Mexico

Language: Spanish, English. Currency: MXN. Business set-up: tax registration (RFC) and company or sole-trader registration. Personal data: the federal law on personal data held by private parties. Product and food rules: the federal health-risk authority.

next

Draft

Draft flagship. Own wording. Process and safety awareness only; no professional advice. Not live.